资源约束项目计划内在稳健性影响因素分析Influence Factors Analysis for Intrinsic Robust of Resource-Constrained Project Schedules
崔万安;王先甲;
摘要(Abstract):
分析了资源约束项目计划稳健性研究的现状,对项目计划稳健性进行了分类;在分类的基础上,对内在稳健性的影响因素进行了系统分析。
关键词(KeyWords): 资源约束;项目计划;内在稳健性
基金项目(Foundation): 中国博士后科学基金(20070420922);; 国家自然科学基金(60574071);; 广西壮族自治区教育厅科研项目(200712LX128);; 广西民族大学引进人才科研启动项目(200702YZ01)
作者(Authors): 崔万安;王先甲;
参考文献(References):
- [1]Willy Herroelen and Roel Leus.Robust and reactiveproject scheduling:a review and classification of proce-dures[J].International Journal of Production Re-search,2004,42(8):1599-1620.
- [2]Stijn Van de Vonder,Erik Demeulemeester,Willy Her-roelen and Roel Leus.The trade-off between stabilityand makespan in resource-constrained project schedu-ling[J].International Journal of Production Research,2006,44(2):215-236.
- [3]M.A.Al-Fawzan and Mohamed Haouari.A bi-objec-tive model for robust resource-constrained projectscheduling[J].International Journal of Production E-conomics,2005,96(2):175-187.
- [4]Goldratt E M,Critical Chain[M].Great Barrington:North River Press,1997.
- [5]Wiest J.D.Some properties of schedules for largeprojects with limited resources[J].Operations Re-search,1964,12(3):395-418.
- [6]刘士新,宋健海,唐加福.基于关键链的资源受限项目调度新方法[J].自动化学报,2006,32(1):60-66.
- [7]赵道致,廖华,刘一骝.关键链法:一种新型的项目进度计划方法[J].天津理工学院学报,2005,21(2):8-12.
- [8]王淑云,朱祥松,李洁.基于资源约束的扩张关键路径法研究[J].管理工程学报,2006,20(6):109-111.
- [9]王仁超,欧阳斌,王琳,等.工程项目计划“关键性”问题拓展研究[J].系统工程与电子技术,2004,26(7):914-917,923.
- [10]Babak Abbasi,Shahram Shadrokh and Jamal Arkat.Bi-objective resource-constrained project schedulingwith robustness and makespan criteria[J].AppliedMathematics and Computation,2006,180(1):146-152.
- [11]Przemyslaw Kobylański,Dorota Kuchta,A note onthe paper by M.A.Al-Fawzan and M.Haouari a-bout a bi-objective problem for robust resource-con-strained project scheduling[J].International Journalof Production Economics,2007,107(2):496-501.
- [12]Hédi Chtourou,Mohamed Haouari A two-stage-prior-ity-rule-based algorithm for robust resource-con-strained project scheduling[J].Computers&Indus-trial Engineering,2008,55(1):183-194.
- [13]Stijn Van de Vonder,Erik Demeulemeester,WillyHerroelen,Roel leus.The use of buffers in Projectmanagement:The trade-aff between stability andmakespan[J].International Journal of Production E-conomics,2005,(97):227-240.